Neoka Group

LaSalle Hospital, Water tower replacement, LaSalle

CIUSS ODIM
1
year
Engineering
Construction

Main tasks performed

  • On-site surveys, sizing, and load calculations for existing mechanical and electrical systems.
  • Design and preparation of mechanical and electrical plans and specifications, including the installation of an ozone water treatment system and a temporary cooler.
  • Development of the schedule, cost estimates, and constructability plan for the replacement of the water tower.
  • Analysis of bids, contractor recommendations, and complete supervision of the work until commissioning.
  • Coordination and technical monitoring to ensure the compliance, reliability, and continuity of the chilled water network during the work.