Neoka Group

Pierrefonds Drinking Water Plant, Production of operation and maintenance deliverables, Pierrefonds

Allen (Ville de Montréal)
1
Year
42
M $CAD
Construction

Main tasks performed

  • Preparation of the list of assets for the City
    of Montreal;
  • Preparation of “CMA” sheets (Creation,
    modification or cancellation) linked to the
    small equipments;
  • Preparation of operating ranges;
  • Preparation of maintenance records for preventive maintenance of equipments;
  • Preparation of lockout sheets;
  • Preparation of characteristics sheets for
    enclosed spaces;
  • Preparation of maintenance routines.
Contact-us
Your project deserves personalized attention. Contact us to speak with our experts and receive a detailed estimate.
Scroll to Top