Neoka Group

Drinking water plant upgrade, Lachine

Filtrum (Ville de Montréal)
2
years
12
M $CAD
Construction

Main tasks performed

  • Preparation of the list of assets for the City of Montreal;
  • Preparation of “CMA” sheets (Creation, modification or cancellation) linked to the replacement parts
  • Preparation of operating ranges;
  • Preparation of maintenance records for preventive maintenance;
  • Preparation of lockout sheets;
  • Preparation of characteristics sheets for enclosed spaces;
  • Preparation of maintenance routines.
Contact us
Your project deserves personalized attention. Contact us to speak with our experts and receive a detailed estimate.
Scroll to Top